In short
- Write the uncertainty, each hypothesis, each test and its result as their own tasks, at the time the work happens.
- Name the technology and the number you could not reach. Do not repeat the SR&ED definition back.
- A hypothesis that failed is still evidence. Keep it, with its result.
- Keep routine work in normal tasks, so the SR&ED trail stays clear.
Why the way you write tasks matters
An SR&ED (often written SRED) claim is judged on evidence. The CRA's eligibility guidelines describe a systematic investigation as forming an idea, testing it, drawing conclusions from the results, and keeping evidence that is generated as the work progresses. Records made at the time carry far more weight than a story written months later.
Most teams already write that evidence every day: task cards, tickets, test notes and comments. The trouble is how they are phrased. "Make search faster" or "Fix weld issue" proves nothing to a reviewer. The same work, written as a question, an idea and a measured result, can carry most of a claim. If you are not sure the work qualifies at all, start with What work qualifies for SR&ED?.
The five kinds of SR&ED task
The CRA lists four steps of a systematic investigation: defining a problem, advancing a hypothesis, planning and testing it by experiment or analysis, and developing logical conclusions from the results. Split into tasks, that gives five kinds of card, and each feeds a part of the project description on Form T661.
- Uncertainty
- What it recordsThe technical question, the target you could not reach, and what known methods gave
- T661 line242
- Hypothesis
- What it recordsOne idea that might resolve it, and why you expect it to work
- T661 line244
- Test
- What it recordsHow you will test the idea, what you hold fixed, and the pass mark
- T661 line244
- Result
- What it recordsThe measured outcome, and whether the idea held up
- T661 line244
- Learned
- What it recordsWhat you now know about the technology that you did not before
- T661 line246
| Task | What it records | T661 line |
|---|---|---|
| Uncertainty | The technical question, the target you could not reach, and what known methods gave | 242 |
| Hypothesis | One idea that might resolve it, and why you expect it to work | 244 |
| Test | How you will test the idea, what you hold fixed, and the pass mark | 244 |
| Result | The measured outcome, and whether the idea held up | 244 |
| Learned | What you now know about the technology that you did not before | 246 |
One uncertainty usually has several hypotheses under it, each with its own test and result. Link each card to the uncertainty it belongs to, so the trail reads in order. See How to file an SR&ED claim for how those lines fit into the form.
How to phrase a technological uncertainty
A pattern that works
Can [technology] reach [measurable target] under [conditions]? Then one line on what the standard approach gave: [known method] measured [result].
- Name the technology, not the business goal. "Typo-tolerant search over 40M rows", not "better search for customers".
- Give the number you need and the number you got. A target makes the gap visible.
- Say what you checked first: the published methods, supplier settings or known designs, and why they fell short.
- Say why the problem is hard. The CRA names signs such as existing design methods not applying, conditions outside the normal operating range, too many variables, interlocking constraints, or data that is not readily available. Write down the one that fits.
Avoid these
Reading the definition back ("We did not know in advance whether this was possible") says nothing about the technology. Business questions ("Will customers pay for it?") and schedule questions are not technological. And if you went around the problem with a known workaround, the CRA says that work is not eligible: write down the workaround as a normal task.
How to phrase a hypothesis
A pattern that works
If we [change], then [measure] will [reach target], because [reason].
- One idea per card. If you change two things at once, you cannot tell which one worked.
- A pass mark you can measure. "Under 200 ms at the 95th percentile" can pass or fail. "Faster" cannot.
- A reason. The "because" is what makes it an investigation rather than trial and error. It should follow from what you already know.
- Write it before you test it. A hypothesis dated after its result reads as a story told backwards.
Writing test and result tasks
The test card says how you will find out: the setup, the data or samples, what stays fixed, and the pass mark. It can be short. Its job is to show the test was planned.
The result card says what happened, as a number where you can, and ends with one word: confirmed, rejected or partly confirmed. Then one line on what it tells you and which hypothesis comes next. Write it the day you get the result, while the details are fresh.
Failed results are evidence
The CRA is clear that success or failure does not decide eligibility. A rejected hypothesis with a measured result shows exactly the systematic work a reviewer looks for. Never delete or rewrite those cards.
Words that weaken a task
- Improve performance
- Why it hurtsNo target, no technology
- StrongerCan the import handle 10M rows in under 5 minutes on one worker?
- Optimize the process
- Why it hurtsSounds like routine tuning
- StrongerIf we cut the cure time to 6 hours, does bond strength stay above 12 MPa?
- Fix bug
- Why it hurtsA bug with a known cause is routine
- StrongerFind why sync drops writes under 3 or more parallel editors (cause unknown)
- Research options
- Why it hurtsReading is not an experiment
- StrongerTest approach A against B on the same 500 samples
- Try stuff / spike
- Why it hurtsReads as trial and error
- StrongerHypothesis: if we add X, Y reaches Z, because...
- Polish / clean up
- Why it hurtsStyle and tidy work do not count
- StrongerKeep it as a normal task, outside the SR&ED trail
| Weak | Why it hurts | Stronger |
|---|---|---|
| Improve performance | No target, no technology | Can the import handle 10M rows in under 5 minutes on one worker? |
| Optimize the process | Sounds like routine tuning | If we cut the cure time to 6 hours, does bond strength stay above 12 MPa? |
| Fix bug | A bug with a known cause is routine | Find why sync drops writes under 3 or more parallel editors (cause unknown) |
| Research options | Reading is not an experiment | Test approach A against B on the same 500 samples |
| Try stuff / spike | Reads as trial and error | Hypothesis: if we add X, Y reaches Z, because... |
| Polish / clean up | Style and tidy work do not count | Keep it as a normal task, outside the SR&ED trail |
Before and after examples
Twenty task trails, four each from software, engineering, manufacturing, food and life sciences, written with the patterns above. Each starts from a card a team might really write, then shows the same work written to hold up. Pick an industry, then use Next to step through its examples.
Example 1 of 4
Software: typo-tolerant search
After
- UncertaintyCan typo-tolerant search over 40M product rows return results in under 200 ms (95th percentile) on one database node? A standard trigram index measured 1.8 s on the full set.
- Hypothesis 1If we split the trigram index by category prefix, the 95th percentile drops under 200 ms, because each query then scans under 5% of the index.
- Test 1Replay 10,000 logged queries against the full set, same node, same cache settings. Pass: under 200 ms.
- Result 1640 ms. Rejected. Scans fell 92%, but merging results across partitions took most of the time.
- Hypothesis 2If we pre-filter candidates before the merge, the 95th percentile drops under 200 ms, because the merge then handles under 1,000 rows.
- Result 2180 ms at normal load, 210 ms at 3x load. Confirmed at normal load, rejected at 3x.
- LearnedEstablished that the merge step, not the index scan, limits typo-tolerant search at this scale, and that pre-filtering removes it up to about 2x load.
Example 2 of 4
Software: offline sync without lost edits
After
- UncertaintyCan a mobile app merge offline edits from up to 5 devices on the same record without losing any write? Last-write-wins lost 3.2% of edits in replay tests.
- Hypothesis 1If we keep a timestamp per field instead of per record, lost edits drop to zero, because most conflicts touch different fields.
- Result 10.9% lost over 50,000 replays. Rejected. Device clocks drift by up to 40 seconds, so timestamps order edits wrongly.
- Hypothesis 2If we replace timestamps with per-field version counters merged as a conflict-free data type, lost edits drop to zero, because ordering no longer depends on device clocks.
- Result 20 lost over 50,000 replays; sync payloads grew 40%. Confirmed.
- LearnedEstablished that clock drift, not conflict frequency, causes the losses, and that counter-based merging removes them at a 40% payload cost.
Example 3 of 4
Software: defect detection on a small camera board
After
- UncertaintyCan a defect detection model run at 15 frames per second on a low-cost camera board with recall above 95%? The best published compact model ran at 6 frames per second with 94% recall on our parts.
- Hypothesis 1If we convert the model to 8-bit integers after training, it reaches 15 frames per second with recall above 95%, because the board's accelerator only runs integer math fast.
- Test 1Run 4,000 labelled part images from two production lines on the board. Pass: 15 frames per second and recall above 95%.
- Result 113 frames per second, 89% recall. Rejected. Small scratches were lost in the conversion.
- Hypothesis 2If we train with 8-bit conversion simulated from the start, recall stays above 95%, because the model learns weights that survive the rounding.
- Result 216 frames per second, 95.4% recall on the same images. Confirmed.
- LearnedEstablished that post-training conversion loses fine defect features on this board, and that training with simulated conversion keeps them at full speed.
Example 4 of 4
Software: clear audio on bad networks
After
- UncertaintyCan live audio stay intelligible at 30% packet loss while keeping delay under 150 ms? The codec's built-in error correction scored below 60% intelligibility past 15% loss.
- Hypothesis 1If we send each audio frame twice, spread 3 packets apart, intelligibility stays above 80% at 30% loss, because lost packets rarely come in long bursts.
- Result 182% intelligibility, but delay rose to 190 ms. Partly confirmed: quality met, delay missed.
- Hypothesis 2If we send a low bitrate copy of each frame instead of a full one, delay stays under 150 ms with intelligibility above 80%, because the smaller copies need less buffering.
- Result 281% intelligibility at 140 ms delay over 200 test calls. Confirmed.
- LearnedEstablished that at this loss rate, buffering for full redundancy, not bandwidth, sets the delay, and that low bitrate redundancy meets both targets.
Example 1 of 4
Engineering: a quieter cooling fan
After
- UncertaintyCan a 120 mm cooling fan move 60 CFM at under 25 dBA? Our current blade moves 60 CFM at 31 dBA, and published low-noise designs reach only 45 CFM at that noise level.
- Hypothesis 1If we add serrated trailing edges to the blades, noise falls under 25 dBA at 60 CFM, because the serrations break up the vortices behind most of the tonal noise.
- Test 1Five printed prototypes, airflow on the test bench, noise in the sound box at 1 m. Pass: 60 CFM and under 25 dBA.
- Result 127 dBA at 58 CFM. Rejected. Broadband noise fell, but one clear tone remained at the blade passing frequency.
- Hypothesis 2If we also space the blades unevenly, noise falls under 25 dBA, because the remaining tone is spread across several frequencies.
- Result 224.5 dBA at 60 CFM over five prototypes. Confirmed.
- LearnedEstablished that blade tone, not turbulence, set the noise floor at this airflow, and that serrated edges with uneven spacing remove it.
Example 2 of 4
Engineering: a wearable seal that lasts
After
- UncertaintyCan a wrist sensor stay sealed to IP68 (1.5 m for 30 minutes) after 2,000 button presses? The off-the-shelf 0.5 mm silicone membrane leaked after 600 presses in cycle tests.
- Hypothesis 1If we use a 0.8 mm membrane, it stays sealed after 2,000 presses, because thicker silicone takes longer to tear.
- Result 1Sealed to 1,400 presses, and the button needed 40% more force. Rejected.
- Hypothesis 2If we keep the 0.5 mm membrane and add a rigid ring that stops it stretching more than 0.3 mm, it stays sealed after 2,000 presses, because the tears start where the membrane stretches most.
- Test 2Eight units on the press rig, then 30 minutes at 1.5 m. Pass: no water inside, button force unchanged.
- Result 2All eight sealed after 2,500 presses, same button force. Confirmed.
- LearnedEstablished that stretch at the membrane edge, not its thickness, causes the leak, and that limiting travel fixes it without a stiffer button.
Example 3 of 4
Engineering: warming a battery in the cold
After
- UncertaintyCan an e-bike battery reach full power at -20 C in under 10 minutes, warming itself with its own charge? Heater pads on the market take 25 minutes and use 8% of the charge.
- Hypothesis 1If we warm the cells by pulsing current through them, they reach 5 C in under 10 minutes using less than 4% of the charge, because the cells then heat from the inside.
- Test 1Three packs held at -20 C for 12 hours, then pulsed. Pass: 5 C in 10 minutes, under 4% of charge used.
- Result 15 C in 8 minutes, 3% of charge used. Confirmed.
- Hypothesis 2If the packs are pulse warmed 300 times, they lose no more than 2% extra capacity, because the pulses never take the cells below their safe voltage.
- Result 24% extra capacity loss after 300 cycles. Rejected.
- LearnedEstablished that pulse warming meets the warm-up target but ages the cells faster than expected. The next hypothesis tests a lower pulse current.
Example 4 of 4
Engineering: a pump that survives sandy water
After
- UncertaintyCan a small water pump impeller last 2,000 hours in water carrying 2% sand? Standard bronze impellers wear out in about 400 hours, and the maker's harder options are rated for clean water only.
- Hypothesis 1If we switch to a hardened steel impeller, it lasts 2,000 hours, because harder metal wears more slowly.
- Result 1900 hours over 3 pumps in the sand loop. Rejected. Wear was worst at the vane tips.
- Hypothesis 2If we also reshape the vanes so the water at the tips moves 20% slower, it lasts 2,000 hours, because wear rises steeply with flow speed.
- Test 2Three pumps run nonstop in the sand loop, impellers weighed every 250 hours. Pass: under 5% weight loss at 2,000 hours.
- Result 23.8% weight loss at 2,300 hours, with 3% less flow. Confirmed.
- LearnedEstablished that flow speed at the vane tips, more than metal hardness, drives wear in sandy water, and that a slower tip shape reaches the target for a small loss of flow.
Example 1 of 4
Manufacturing: welding thin aluminum
After
- UncertaintyCan we MIG weld 6xxx aluminum brackets at 2 mm wall with porosity under 1% by area? The supplier's settings give 4 to 6%.
- Hypothesis 1If we preheat to 80 C, porosity falls under 1%, because moisture on the surface causes most pores.
- Result 13.9% over 30 coupons. Rejected. Preheat alone barely changed it.
- Hypothesis 2If we raise argon flow to 22 L/min with a longer post-flow, porosity falls under 1%, because the thin wall cools fast and loses shielding.
- Result 20.8% over 30 coupons, 1.4% on corner joints. Confirmed on straight joints only.
- LearnedEstablished that shielding gas coverage, not preheat, drives porosity at this wall thickness, and that corner joints need a different torch angle to keep it.
Example 2 of 4
Manufacturing: warpage in a molded housing
After
- UncertaintyCan a 300 mm glass-filled nylon housing be injection molded with warpage under 0.3 mm? Mold flow simulation with standard gate positions predicted 1.1 mm, and trial parts measured 1.2 mm.
- Hypothesis 1If we move to two gates at the ends, warpage drops under 0.3 mm, because the glass fibres then line up along the long side.
- Result 10.7 mm over 20 parts. Rejected. Fibres lined up, but the thick rib still cooled last and pulled the part.
- Hypothesis 2If we add conformal cooling channels under the rib so it cools 15 C faster, warpage drops under 0.3 mm, because shrinkage then evens out.
- Result 20.25 mm over 20 parts; cycle time rose by 8 seconds. Confirmed.
- LearnedEstablished that uneven cooling at the rib, more than fibre direction, causes the warpage in this design, and that cooling it locally brings the part in tolerance.
Example 3 of 4
Manufacturing: milling thin titanium walls
After
- UncertaintyCan 0.8 mm titanium walls be milled to within 0.02 mm without chatter marks? Tooling supplier feeds and speeds gave chatter and 0.08 mm error.
- Hypothesis 1If we use a cutter with uneven tooth spacing, chatter stops and error falls under 0.02 mm, because uneven spacing breaks up the vibration.
- Result 1Chatter reduced, 0.05 mm error over 12 parts. Rejected.
- Hypothesis 2If we fill the cavity behind the wall with a low-melt wax before finishing, error falls under 0.02 mm, because the wall can no longer flex away from the cutter.
- Test 212 parts, same cutter and program, wax poured at 70 C and removed after. Pass: under 0.02 mm, no chatter marks.
- Result 20.015 mm, no marks on all 12 parts. Confirmed.
- LearnedEstablished that wall flex, not tool vibration alone, limits accuracy at this thickness, and that backing the wall solves it.
Example 4 of 4
Manufacturing: coating recycled aluminum
After
- UncertaintyCan powder coat on 100% recycled aluminum extrusions pass the cross-hatch adhesion test at the top class? Our standard chrome-free pretreatment gives class 3 on recycled stock and class 0 on new metal.
- Hypothesis 1If we double the etch time, adhesion reaches class 0, because the recycled surface carries a thicker oxide layer.
- Result 1Class 2 over 40 panels. Rejected.
- Hypothesis 2If we switch to a zirconium conversion coat with a higher acid level, adhesion reaches class 0, because the extra silicon and iron in recycled alloy block the current coat from forming.
- Result 2Class 0 on 38 of 40 panels. Confirmed.
- LearnedEstablished that alloy impurities, not surface oxide, cause the adhesion failure, and that a stronger zirconium coat overcomes them.
Example 1 of 4
Food: shelf life without preservatives
After
- UncertaintyCan a plant-based cheese with no added preservatives keep 60 days refrigerated without mould? Published formulations reach 21 to 28 days.
- Hypothesis 1If we lower water activity below 0.92 with a fiber blend, mould-free life reaches 60 days, because mould growth at 4 C stalls below that level.
- Test 1Three batches at 0.90, 0.91 and 0.92, stored at 4 C, checked weekly. Pass: no visible mould at day 60 and texture approved by the taste panel.
- Result 10.90 and 0.91 reached 60 days; 0.92 reached 45. Texture failed the panel at 0.90. Partly confirmed.
- LearnedEstablished that 0.91 water activity reaches the target with this fiber blend, and that texture, not mould, now sets the lower limit.
Example 2 of 4
Food: gluten-free bread volume
After
- UncertaintyCan a gluten-free, egg-free loaf reach a specific volume of 3.5 mL per gram? Published recipes reach 2.4 to 2.8.
- Hypothesis 1If we add 4% psyllium, volume reaches 3.5, because psyllium forms a gel that holds gas like gluten does.
- Result 13.0 over 5 bakes. Rejected. Gas held better, but the crumb set before the loaf finished rising.
- Hypothesis 2If we add a 12-hour sourdough ferment to the psyllium dough, volume reaches 3.5, because the acid slows how fast the starch sets in the oven.
- Result 23.6 over 5 bakes; crumb dry by day 3. Confirmed for volume.
- LearnedEstablished that the timing of starch setting, not gas holding alone, limits volume in this dough, and that acid from fermentation delays it.
Example 3 of 4
Food: less sugar in a sports drink
After
- UncertaintyCan we cut the sugar in a sports drink by 50% with no sweetness difference a taste panel can detect, while keeping osmolality under 300 mOsm/kg? Stevia blends gave an aftertaste the panel picked out.
- Hypothesis 1If we replace the removed sugar with allulose, the panel finds no difference, because allulose tastes close to sugar.
- Result 1No difference found, but osmolality rose to 340. Rejected.
- Hypothesis 2If we use half allulose and a stevia dose below the aftertaste level, osmolality stays under 300 with no difference found, because each sweetener stays below its own limit.
- Test 2Triangle test with 30 panelists, 3 sessions. Pass: no significant difference and osmolality under 300.
- Result 2290 mOsm/kg, no significant difference. Confirmed.
- LearnedEstablished that no single sweetener met both limits, and that a split blend keeps each one below the level where it causes problems.
Example 4 of 4
Food: frozen dumpling wrappers that crack
After
- UncertaintyCan a frozen dumpling wrapper survive storage at -18 C and 5 freeze-thaw cycles without cracking? Our standard wheat dough cracks on 30% of dumplings after 3 cycles.
- Hypothesis 1If we add 5% tapioca starch, cracking falls under 5%, because the starch holds water and keeps the dough flexible.
- Result 118% cracked after 5 cycles. Rejected.
- Hypothesis 2If we pre-cook 10% of the flour with water before mixing, cracking falls under 5%, because cooked starch binds more water and forms less ice.
- Result 23% cracked after 5 cycles over 500 dumplings. Confirmed.
- LearnedEstablished that ice forming in the wrapper drives the cracking, and that cooked starch, more than added starch, keeps the water bound.
Example 1 of 4
Life sciences: freezing cells without DMSO
After
- UncertaintyCan stem cells be frozen without DMSO and keep 85% alive after thawing? Published DMSO-free mixes report 60 to 70%.
- Hypothesis 1If we freeze in a sugar and polymer mix at 1 C per minute, 85% survive, because the sugar protects the cell membranes.
- Result 168% alive over three runs. Rejected.
- Hypothesis 2If we add the polymer 2 hours before freezing so it can enter the cells, 85% survive, because less ice then forms inside them.
- Test 2Three runs, cells counted with a live and dead stain 24 hours after thawing. Pass: 85% alive.
- Result 287% alive over three runs. Confirmed.
- LearnedEstablished that ice inside the cells, not membrane damage, limits survival without DMSO, and that loading the polymer earlier reduces it.
Example 2 of 4
Life sciences: a field test for crop disease
After
- UncertaintyCan a field test detect potato blight from one leaf in under 30 minutes with 95% accuracy? Lab PCR takes 2 days, and field kits catch only 70% of early infections.
- Hypothesis 1If we run a constant temperature DNA test (LAMP) on a crushed leaf, accuracy reaches 95% in 30 minutes, because it needs no lab equipment to cycle temperatures.
- Result 188% accuracy over 200 leaves. Rejected. Compounds from the leaf blocked some reactions.
- Hypothesis 2If we first pass the sample through a paper strip that holds the DNA, accuracy reaches 95%, because the blocking compounds wash through.
- Result 296% over 200 leaves, in 25 minutes. Confirmed.
- LearnedEstablished that leaf compounds, not test sensitivity, limited field accuracy, and that a paper strip clean-up removes them in the field.
Example 3 of 4
Life sciences: a high strength antibody that stays clear
After
- UncertaintyCan an antibody be held at 150 mg/mL in a ready-to-inject liquid without clumping for 18 months at 4 C? Our standard buffer clumps above 100 mg/mL within 3 months.
- Hypothesis 1If we add arginine to the buffer, no clumps form, because arginine stops the protein molecules sticking together.
- Result 1No clumps in a sped up test equal to 6 months, but the liquid was too thick to inject (40 cP). Partly confirmed.
- Hypothesis 2If we also add a salt that lowers thickness, it injects under 20 cP with no clumps, because the salt reduces the pull between molecules.
- Result 215 cP, no clumps in a sped up test equal to 18 months. Confirmed.
- LearnedEstablished that arginine stops clumping at this strength but thickens the liquid, and that a salt brings it back to an injectable level.
Example 4 of 4
Life sciences: a feed additive that cuts methane
After
- UncertaintyCan a seaweed feed additive cut cattle methane by 50% for 3 months without lowering weight gain? Published trials show 30 to 40% cuts that fade after 2 months.
- Hypothesis 1If we add 0.5% dried seaweed to the feed, methane falls by 50%, because the active compound blocks the microbes that make methane.
- Result 145% lower in month 1, 20% lower by month 3. Rejected.
- Hypothesis 2If we put the seaweed in a slow release pellet, the cut holds at 50% for 3 months, because the compound was breaking down in the stored feed.
- Test 240 animals, half on the pellet, methane measured weekly, weight monthly. Pass: 50% lower at month 3, no change in weight gain.
- Result 252% lower in month 1, 48% by month 3, weight gain unchanged. Partly confirmed.
- LearnedEstablished that the fading came from the compound breaking down in storage, not from the animals adapting, and that a slow release pellet keeps most of the effect.
The numbers are examples
The figures above are made up to show the pattern. Your cards should carry your own measurements.
What not to label SR&ED
Keeping routine work out of the trail makes the SR&ED work easier to see and easier to defend. These belong in normal tasks:
- Screens, layouts, style changes and copy.
- Bug fixes where the cause is known, and setting up tools or equipment with known settings.
- Workarounds that avoid the technical problem instead of resolving it.
- Market research, pricing tests, customer surveys and sales work.
- Quality control, routine testing and routine data collection.
- Production work after the uncertainty is resolved.
Work that directly supports an experiment, like building a test rig or writing the harness that runs the test, can be part of the claim. Link those tasks to the hypothesis they serve.
A task template you can copy
Paste these fields into the description of any SR&ED task. Fill in the ones that fit the task type and leave the rest out.
- Type
- What to writeUncertainty, Hypothesis, Test, Result or Learned
- ExampleHypothesis
- Links to
- What to writeThe uncertainty card this belongs to
- ExampleUncertainty: typo-tolerant search under 200 ms
- Question
- What to writeThe technical question in one sentence
- ExampleCan typo-tolerant search over 40M rows return in under 200 ms?
- Target
- What to writeThe number that counts as success
- ExampleUnder 200 ms, 95th percentile
- Known methods tried
- What to writeWhat public or in-house knowledge gave
- ExampleStandard trigram index: 1.8 s
- If, then, because
- What to writeThe idea and why you expect it to work
- ExampleIf we split the index by category prefix, scans drop under 5%
- Result
- What to writeThe measured outcome and the date
- Example640 ms, October 12
- Outcome
- What to writeConfirmed, rejected or partly confirmed
- ExampleRejected
- Next step
- What to writeThe next hypothesis, or what was learned
- ExamplePre-filter candidates before the merge
| Field | What to write | Example |
|---|---|---|
| Type | Uncertainty, Hypothesis, Test, Result or Learned | Hypothesis |
| Links to | The uncertainty card this belongs to | Uncertainty: typo-tolerant search under 200 ms |
| Question | The technical question in one sentence | Can typo-tolerant search over 40M rows return in under 200 ms? |
| Target | The number that counts as success | Under 200 ms, 95th percentile |
| Known methods tried | What public or in-house knowledge gave | Standard trigram index: 1.8 s |
| If, then, because | The idea and why you expect it to work | If we split the index by category prefix, scans drop under 5% |
| Result | The measured outcome and the date | 640 ms, October 12 |
| Outcome | Confirmed, rejected or partly confirmed | Rejected |
| Next step | The next hypothesis, or what was learned | Pre-filter candidates before the merge |
Downloads: the blank task card to paste into your tool, and the template with all all twelve example trails as a spreadsheet.
When to write each task
- Uncertainty: the day the team realizes known methods will not do the job. That date is where the SR&ED work starts.
- Hypothesis and test: before the test runs.
- Result: the same day the result comes in.
- Learned: when the uncertainty is resolved, whether it worked or not. Work after that point is usually routine.
Add notes, never backdate
If a task was written badly at the time, add a dated note that explains it. Do not rewrite the original or change its date. A reviewer can see edit history, and records that look rebuilt lose their value.
How Sredify uses your tasks
Sredify reads the task cards and tickets in the tools your team already uses, sorts them into uncertainties, hypotheses and results, and cites them as the evidence behind each line of the project description. The clearer the tasks, the less there is to fill in at claim time, whether you prepare the claim yourself or hand it to a consultant.
Frequently asked questions
What documentation do I need for SR&ED?
Records made while the work happens that show the technical problem, the ideas you tested, how you tested them, the results and what you learned, plus who did the work and their time. Task cards and tickets can carry most of it when they are written for it.
Do I need a separate task for every hypothesis?
It is the clearest way. One card per idea keeps each test, result and date apart, so a reviewer can follow the order in which you worked.
Can I rewrite old tasks before I file?
Add dated notes instead. Records made at the time carry the most weight, and rewritten or backdated ones can undermine the rest of the claim.
Can a cost target be a technological uncertainty?
Not on its own. The CRA says a cost target does not create technological uncertainty by itself, but trying to meet one might, when known methods cannot reach it within that cost.
Do tasks replace the T661 project description?
No. The description is still written for the claim. Well written tasks are the evidence behind it, and they make the description much faster to write.
Prepare your SR&ED claim with Sredify
Connect the tools your team already uses, see which work may qualify, and build a claim with every hour traced to its source.
Sign in to get startedSources
- CRA: SR&ED eligibility (the steps of a systematic investigation)
- CRA: Guidelines on the eligibility of work for SR&ED tax incentives
- Income Tax Act s. 248(1): definition of SR&ED
This guide explains the general rules. It is not tax advice: talk to your accountant or SR&ED preparer about your own claim.